TTMA and TMA Lead Times

TMAs and TTMAs are in high demand right now. At Barricades and Signs, we have access to industry-leading products. Below we’ve summarized our options with applicable lead times.

TMAs or Truck Mounted Attenuators are popular for a few reasons, most being; the ability to move quickly, predictable safety measures, and reliability. Here are the TMAs that we can deliver to you.

 

Gregory TTMA 200 – 14 days lead time

The Gregory TTMA 200 is easy to tow and is a reliable option for a TTMA. With its industry-wide popularity, it’s an item that we actively carry within our inventory. If you need a fast solution, this should be an option to consider.

 

 

TTMA 200

 

Scorpion II By TrafFix Devices – Three to Six Months Lead Time (As of February 2022)

The Scorpion II’s have become one of the most popular TMAs. Because of its folding properties and MASH Test Level 3 compliance, many choose this line of TMAs.

scorpion traffix devices scorpion traffic devices Scorpion-II-metro-barricades-and-signs-0004_570
Scorpion II TMA Scorpion II Trailer Scorpion II Metro

 

Truck Mounted Attenuators by Trinity Highway – Four to Six Weeks Lead Time (As of February 2022)

Truck Mounted Attenuators offer speed and maneuverability over a truck trailer attenuator. With easy-to-operate abilities and replaceable parts, these TMAs might offer a solution to your needs.

Alpha 70K TMA SS90 HD SS180 
MPS 350 X SS 180 M

 

Truck Trailer Mounted Attenuators by Trinity Highway – Four to Six Weeks Lead Time (As of February 2022)

Truck trailer-mounted attenuators are a viable option that requires no modifications for your fleet. They can be easily picked up and deployed on site in minimal time and offer the same safety measures as TMAs.

SMT SST VORTEQ